Strelley Road Library Public Library & Apartments

Project

Strelley Road Library – New Build Timber Frame Fit-out

Location

Nottingham

Project Summary

This project consisted of a new build timber frame super structure creating a public library and 37 apartments.

The duration of our works was 10 months with a value in excess of £1m.

GEDA Construction

Scope of Works

A comprehensive M&E design and installation project, which included:

The disciplines included:

  • LV distribution
  • Internal & External lighting
  • General power
  • Data/ phone systems
  • Fire Alarm
  • Intruder Alarm
  • Access Control
  • IRS (TV system)
  • Lightening protection
  • PV system
  • Hot & cold water distribution
  • Centralized boiler plant
  • Heat interface units
  • CHP unit
  • MVHR systems
  • Air conditioning
  • Sanitary Ware installations
  • BMS system
  • Sprinkler system